Skip to product information
1 of 8

Everything Mary

Everything Mary Large Plastic Bead Storage Organizer Box with 24 Stackable Jars – Craft Storage for Beads, Diamond Painting & Small Supplies

Everything Mary Large Plastic Bead Storage Organizer Box with 24 Stackable Jars – Craft Storage for Beads, Diamond Painting & Small Supplies

Regular price $11.99 USD
Regular price Sale price $11.99 USD
Sale Sold out

Keep every bead, gem, and tiny embellishment exactly where you can find it with the Everything Mary Large Plastic Bead Storage Organizer Box. Built around 24 stackable jars, this compact organizer gives beaders, diamond painters, and jewelry makers a dedicated home for small supplies that otherwise end up scattered across the craft table. Lightweight and durable, it travels easily from studio to class to kitchen table, so sorting supplies takes seconds instead of digging through loose bags and mismatched containers.

  • 24 stackable, screw-top jars – Individual jars keep beads, sequins, and diamond painting drills sorted by color, size, or project.
  • Compact, space-saving footprint – At 9.25" W x 6.25" D x 1" H, the slim organizer tucks into a drawer, tote, or shelf without taking up much room.
  • Lightweight, durable plastic construction – Sturdy jars and a solid outer box stand up to regular handling, travel, and studio use without cracking.
  • Made for beading and beyond – Perfect for beads, diamond painting drills, jewelry findings, buttons, and other small craft or hardware supplies.
  • Grab-and-go portability – The enclosed box keeps jars secure and upright, so supplies stay put whether it's stored flat or carried to class.

With small supplies sorted and secured, every beading or diamond painting session starts organized—so you can spend less time searching and more time creating.

SKU:EVM10558-2

Quantity
View full details